Background;
Ongoing Installation of Geotextile reinforcement membrane before Application of Maricoat 100 and Top seal
This eight Story High rise Building situated in the heart of Lagos, was been constructed by Telisol Construction Company, . The structure has large terrace, over 1000 Square metre in All. Advanced Concrete Technologies Ltd was invited in to Waterproof the terrace and Roof with our state of the art Polyurethane waterproof membrane. The project has since been completed and successfully handed over to the client.
Solution;
The surface was properly prepared Maricoat 100 polyurethane system was then installed, after first priming with Hydro Primer, then a Hydrosil Geotextile membrane was installed, after which the Membrane was finally covered with Maricoat 100
This eight Story High rise Building situated in the heart of Lagos, was been constructed by Telisol Construction Company, . The structure has large terrace, over 1000 Square metre in All. Advanced Concrete Technologies Ltd was invited in to Waterproof the terrace and Roof with our state of the art Polyurethane waterproof membrane. The project has since been completed and successfully handed over to the client.
Solution;
The surface was properly prepared Maricoat 100 polyurethane system was then installed, after first priming with Hydro Primer.